SPORTAFLOR · PROJECT SERVICES

Project & Tender Support

From first specification to final shipment, Sportaflor supports distributors, contractors and installers with product matching, technical documents, samples, accessories, quotation and export coordination.

Indoor sports court and project flooring
SPECIFICATION · TECHNICAL SUPPORT · PROJECT DELIVERY
PROJECT-FIRST SUPPORT
Start with the requirement.

Application, area, specification, destination and required date are enough to begin.

01
FULL PROJECT WORKFLOW

A clear path from project requirement to shipment.

01

Project Requirements

Confirm sport or application, indoor or outdoor environment, project area, destination, schedule and commercial constraints.

02

Application & Product Matching

Match the application to the relevant flooring family before detailed quotation.

03

Specification Confirmation

Lock thickness, color, pattern, size, structure and other required parameters.

04

Technical Documents

Check the relevant technical data, certificates and test reports against the exact model.

05

Samples & Approval

Use physical samples when required for color, texture, thickness or client approval.

06

Quotation

Confirm material, accessories, quantity, packing, trade term and commercial conditions.

07

Project Schedule

Align stock preparation or production with the required project timeline.

08

Accessories & Line Marking

Coordinate welding rod, edging, adhesive-related items and court line requirements.

09

Shipping Documents

Prepare packing and export documentation according to the confirmed shipment.

02
APPLICATION → PRODUCT MATRIX

Start with the venue and use condition, then narrow the product family.

Application / Venue Product Family Key Focus Specification Path
Indoor Basketball / Badminton / Volleyball Indoor PVC Sports Flooring Sports performance, comfort, slip and installation Thickness + pattern + color + court requirement
Outdoor Courts Outdoor PVC / PP Sports Tiles Outdoor suitability, drainage, UV and surface performance Application + climate + system + color
Gym / Fitness / Weight Room Rubber Rolls / Rubber Mats Impact, density, vibration, equipment load and cleaning Thickness + density + format + equipment zone
Dance / Studio Dance Flooring Surface feel, movement, installation method and color Application + thickness + surface + color
Commercial / School / Public Space Homogeneous / Heterogeneous Vinyl Traffic, maintenance, fire / environmental documentation Use area + wear requirement + specification
Sound / Vibration Control Soundproofing Mats Acoustic or vibration target and installation build-up System requirement + thickness + project condition
03
TECHNICAL DOCUMENTS

Documents should follow the exact product model and applicable scope.

01

Technical Data

Product structure, dimensions, performance data and specification references.

02

Certificates

Certification availability is checked against the exact model before project use.

03

Test Reports

Test reports are matched to their applicable product and specification scope.

04

Installation & Packing

Installation instructions and packing information can support site and shipment planning.

04
ACCESSORIES & LINE MARKING

Coordinate the material and supporting items before shipment.

Sports flooring installation and court preparation
INSTALLATION SUPPORT

Plan the complete flooring package.

Confirm accessories and court-line requirements together with the main flooring system.

Installation Accessories

  • Welding rod / welding wire where applicable
  • Edging and trim options
  • Tape or accessory coordination
  • Installation guidance by product type

Line Marking

  • Sport and court dimensions
  • Line colors
  • Single-sport or multi-sport layout
  • Service feasibility confirmed per project

Sample Approval

  • Color and surface confirmation
  • Thickness or structure reference
  • Courier arrangement
  • Special sample conditions confirmed separately

Site Information

  • Subfloor condition
  • Indoor / outdoor environment
  • Installation method
  • Project schedule and handover date
05
SHIPPING & EXPORT

Project support continues through packing and export documentation.

Commercial Documents

Proforma Invoice, Commercial Invoice, Packing List and other shipment documents are prepared according to the confirmed order.

Packing & Shipping

Packing method, shipping marks and shipment arrangements are confirmed against the product, quantity and destination.

Trade Terms

FOB China port is the normal baseline. CFR / CNF and other arrangements can be discussed according to the order and destination.

06
PROJECT PROCUREMENT

The same project may follow a stock path or a made-to-order path.

STOCK / REPLENISHMENT

Confirm commercial feasibility first.

For urgent or repeat requirements, start with the exact product, specification, quantity and destination.

Stock Price MOQ Lead Time
PROJECT / MADE-TO-ORDER

Confirm fit and specification before production.

For project-based orders, product selection, technical documents, customization feasibility, MOQ and production timing should be reviewed together.

Application Specification Technical Schedule
PROJECT RFQ

Tell us what the project needs.

Share the application, product or specification, quantity or project area, destination, schedule and any technical or certification requirements. We can then confirm the appropriate supply path.